- 1,199
I screwed up and sent an electronic PDP app for a 1/1/1 effective date that was supposed to be for 12/1/14 effective however I did put the correct IEP code .UHC PHD said it can't be changed but in the past I had submitted another IEP application requesting an effective the month after the person turned 65 and instead of giving the consumer the requested effective date the enrollment dept defaulted the effective date to the 65th birthday month instead of the following month as requested. When I called about this I was told any IEP coded app sent in b4 t65 month defaults to t65 month. So which is it?
The big problem in this case is that the guy has 2 drugs to fill this month that cost about 1,000.00